Subhub Project Awarded FORESEA Funding to Test at EMEC

QED Naval are excited to announce that they have been awarded funding for the open sea testing at the EMEC tidal test sites. This provides access to both the scale tidal test site along with the grid connected Falls of Warness site.

QED Naval have engaged in pre-commercial discussions for a contract at EMEC to carry marine operations at their test site that aims to validate claims of the Subhub tidal platform. These include:

  • Reduction in the cost of deployment of tidal turbines using a single marine operation to install the turbines ready for operation on the seabed within a broad range and tidal states and wave conditions.
  • Enhanced power output and site capacity factors.
  • Retrieval of the system for maintenance in a single marine  operation using a low cost multicat vessel over a broad range of conditions.
EMEC Falls of Warness tidal test stie.
EMEC Falls of Warness tidal test stie.

Significant site feasibility work has already been carried out by QED Naval as part of the FORESEA application which will ultimately see them connect tidal turbines to the grid for verification of the enhanced performance characteristics provided by the Subhub foundation solution.

GIS mapping tool containing all the flow data, berth positions and bathymetry of the Falls of Warness tidal test site.

GIS mapping tool containing all the flow data, berth positions and bathymetry of the Falls of Warness tidal test site.